case studies
Peabody completes 189 Passivhaus affordable homes at Deptford Landings
The housing association's first full Passivhaus development, built by Higgins Partnerships in southeast London, delivers 130 social rent and 59 shared ownership homes with first residents due before the end of 2026.
Peabody has completed 189 affordable homes built to the Passivhaus standard at Deptford Landings in southeast London, its first full Passivhaus development, with the first residents expected to move in before the end of the year.
The housing association said on 18 November that 130 of the homes are for social rent and 59 for shared ownership, in a mix of one, two and three bedrooms. Each has a private balcony, and residents will share a landscaped courtyard and roof terraces.
Higgins Partnerships was the construction partner. Peabody described the scheme as one of the UK's largest Passivhaus housing developments and, at topping out, as thought to be one of the largest single-phase Passivhaus projects in the UK to date.
Simon Barry, Peabody's Managing Director of Development for South London, said: "These homes will give more people and families in Deptford a good quality, affordable place to call home. With 130 for social rent, they'll make a real difference to people who need them most."
The fabric and services
Peabody said the homes have well-insulated walls, triple-glazed windows and carefully sealed doors, with a ventilation system that brings in fresh air while retaining much of the warmth in colder months. When it appointed Higgins in April 2024, Peabody said the energy needed to heat and cool Passive House buildings can be 90 percent lower than that of regular buildings.
Higgins said all three blocks were built to Passivhaus Classic standard, with Etude acting as independent Passivhaus certifier. Peabody named the Passivhaus specialists as Beyond Carbon, formerly Delta Q.
Building services engineer Max Fordham, writing about the project, said heating is provided by air source heat pumps with radiators as emitters. Comfort cooling comes from water source heat pumps inside each flat feeding a fan coil in the living room, and two of the three blocks carry large rooftop arrays of photovoltaic (PV) panels.
Higgins said Block 6B includes seven wheelchair-accessible homes.
The homes by block
Peabody set out the make-up of the three blocks when it appointed Higgins in April 2024.
| Block | Homes |
|---|---|
| Block 6A | 69 |
| Block 6B | 61 |
| Block C | 59 |
Block 6A provides one- and two-bedroom homes, Block 6B homes of one to three bedrooms, and Block C one- and two-bedroom homes, Peabody said at the time.
Funding and timeline
Peabody said the development received funding from the Greater London Authority. At the appointment of Higgins, Simon Barry, Managing Director, Development at Peabody, said: "our investment of more than £75m, including grant support, will provide nearly 200 homes for Londoners."
Construction officially started with a ground-breaking event on Wednesday 18 September 2024. Peabody and Higgins held a topping-out ceremony on Wednesday 26 February 2025, when Peabody said the homes were expected to be ready for residents by autumn 2026. The completion announcement now puts the first move-ins before the end of the year.
The wider project team included architects Allford Hall Monaghan Morris and project consultants RLB, which said it provided employer's agent, principal designer and cost management services. The Passivhaus Trust also lists PRP as landscape architect and Stantec as structural engineer.
The wider regeneration
The homes form part of the Deptford Landings regeneration led by Lendlease, which Peabody said is expected to provide more than 1,500 homes alongside shops, green spaces and community facilities. Higgins described the scheme as the Plot 6 development in the London Borough of Lewisham.
Peabody said the development supports its plans to make homes more energy-efficient and reduce their environmental impact, and pointed to more than 11,000 households on Lewisham Council's housing waiting list as the need the homes will help meet.
The first residents are due to move in before the end of 2026.
On the record: Higgins Partnerships, Allford Hall Monaghan Morris, Max Fordham, RLB, Passivhaus Trust, PRP
Sources
- Peabody (opens in a new tab) (accessed 2026-11-19)
- Peabody (opens in a new tab) (accessed 2026-11-19)
- Peabody (opens in a new tab) (accessed 2026-11-19)
- Peabody (opens in a new tab) (accessed 2026-11-19)
- Higgins Partnerships (opens in a new tab) (accessed 2026-11-19)
- RLB (opens in a new tab) (accessed 2026-11-19)
- Passivhaus Trust (opens in a new tab) (accessed 2026-11-19)
- Max Fordham (opens in a new tab) (accessed 2026-11-19)
This story was researched from the primary sources above and checked against them before publication. Spotted an error? Tell us and we will correct it promptly.